Clients read plans badly and walk spaces well. Maket's walk mode turns the first meeting from an explanation into a tour.

Before the meeting

Load the DXF, check the layer roles, set the floor height, save the project. Two minutes.

In the meeting

Play the build animation once; it explains the plan better than you can. Then switch to Walk and let the client hold the keyboard. Watch where they stop.

What you learn

Which doorway feels narrow, which room feels dark, where they expect a window. These reactions are worth more than a rendering they nod at.

After the meeting

Revise the plan, reload, save as a new project. The GLB export goes to your visualization pipeline if the project proceeds.