Every image and video operation in the studio comes in tiers. The names are honest: draft is for deciding, standard is for most finished work, cinema and cinema pro are for the shots people will remember. Tiers are not a quality slider you set once for a project. They are a budgeting tool you apply per scene, and the films that look expensive are usually the ones that spent carefully rather than the ones that spent most.

Draft

Fast and cheap. Use it for storyboards, for testing a prompt, for anything you expect to redo. A draft image is the cheapest way to check composition, framing and mood, and Basic and Pro include a few free draft images a month; on the Free plan drafts are paid from the one-time sign-up credits, which still makes them the cheapest way to try before spending more. Draft video at five seconds is a good way to check motion before committing: does the character walk the way you imagined, does the camera move too much, does the light hold. Draft clips keep the drawn look of a storyboard frame faithfully, which makes them a fair preview of a standard clip.

Standard

The default for delivered work: catalog images, social clips, most scenes of a short film. The jump in detail over draft is visible, and the cost is visible too; the pricing page lists both, live from the same table the app uses. Standard and draft scenes run five or ten seconds. For drawn styles such as anime, watercolor or comic book, standard is often the right ceiling, because the faster video model keeps flat colour flat where the cinema tiers tend to add photographic texture.

Cinema and cinema pro

Reserved for hero shots: the opening, the close-up that carries the emotion, the product image on the landing page. Cinema scenes run four, six or eight seconds, and costs scale with duration, so keep cinema clips short and let standard clips carry the connective tissue. Cinema tiers give richer motion and lighting; they also soften very flat styles, so use them where motion matters more than line.

A simple budget for ten scenes

  1. Storyboard all ten on draft. Look at the strip. Fix the screenplay if more than a few frames are wrong.
  2. Produce eight scenes on standard. These are the scenes where the story happens and nobody is studying the pixels.
  3. Produce two scenes on cinema: the one the film opens on and the one it turns on.
  4. Check the estimate before you run it. The wizard shows what is charged now and what production will cost; the Ready screen replaces the estimate with the exact figure once the real scenes exist.

Compare that figure with your monthly allowance and leave room for retries. Every plan has a cost multiplier: the free plan pays more per operation, Basic pays list, Pro pays less. The multiplier is already applied to the figure you see.

Where tiers do not help

A higher tier cannot fix a screenplay that lost the plot, a character who drifts because the cast sheet was ambiguous, or a line the narrator repeats. Those faults live upstream and cost nothing to fix there. If a film scores badly on story or sound, do not re-render it on cinema; edit the text and the cast first. Tiers raise motion and texture. They raise nothing else.

Mixing tiers in one film

Mixing is fine and normal. The assembly step normalises resolution and frame rate, so a standard clip cut against a cinema clip does not jump. What does jump is style: if the cinema tier added photographic texture to one scene of a watercolor film, the seam shows. Preview the cinema scene against its neighbours before committing the rest.

Rules we follow ourselves

  • Produce one minute before producing four. Most creative decisions are visible in the first minute.
  • Regenerate single scenes, not the film. Only the scenes you touch are charged again.
  • Use draft for animatics, standard for the body, cinema for two or three shots.
  • For drawn styles, try standard first and move up only if the motion needs it.
  • Read the price line every time. It is there so the decision is yours.

Frequently asked

Can I change a scene's tier after production? Yes. Open the scene card, pick the tier, regenerate that scene. Only that clip is charged, and the film is re-edited with the new clip.

Is cinema pro always better than cinema? Not for every scene. It is the richest tier for motion and lighting, and the most expensive per second. Use it where the viewer is looking closely and nowhere else.

What happens if a cinema clip fails? The credits for that operation return to your wallet automatically. Failed operations are refunded individually, not averaged into the film.